1. Convert a flow of 600 gallons per minute to million gallons per day
2. Convert a Flow from 1.2 MGD to cubic feet per second
3. Estimate the velocity of wastewater flowing through a grit channel if a stick travels 32 feet in 36 seconds.
4. A grit channel removed 3.2 cu ft of grit during a period when the total flow was 0.8 MG. How many liters of grit are removed per cubic meter?
5. A circular secondary clarifier handles a flow of 0.9 MGD and suspended solids of 3,600 mg/L. The clarifier is 50 ft in diameter and 8.0 ft deep. Find the detention time, surface loading rate, weir over flow rate and solids loading.
Answers:
1. 0.86 MGD
(Flow, gal/min X 60 min/hr X 24 hr/day) / (1,000,000/M)
(600 gal/min X 60 min/hr X 24 hr/day) / (1,000,000/M)
2. 1.86 CFS
(Flow, MGD X 1,000,000/M) / (7.48 gal/cuft X 60 min/hr X 24 hr/day) =
3. 0.89 ft/sec
(Distance Traveled, ft) / (Time, sec)
(32 ft) / (36 sec) =
4. 4.0 cuft/MG
(3.2 cuft) / (0.8 MG) =
5.
Detention Time = 3.1 hr
Flow, gpd = 0.9 MGD X 1,000,000/M = 900,000 gpd
(Tank volume, cuft X 7.48 gal/cuft X 24 hrs/day) / (Flow, GPD)
Tank area, sqft = 0.785 X D, ft X D, ft OR 3.14 X R, ft X R, ft
Tank area, sqft = 0.785 X 50 ft X 50 ft = 1,962.5 sqft
Tank volume, cuft = area, sqft X Height, ft
1,962.5 sqft ft X 8 ft = 15,680 cuft
(15,680 cuft X 7,48 gal/cuft X 24 hr/day) / (900,000 gpd) =
NOTE: (R is Radius = 1/2 the diameter)
Surface Loading = 459 gpd/sqft
(Flow, gpd) / (Area, sqft)
(900,000 gpd) / (1,960 sqft)
Length of Weir, ft = 157 ft
3.14 X Diameter, ft
3.14 X 50 ft
Weir Overflow, GPD/ft = 5,730 GPD,ft
(Flow, GPD) / (Length of Weir, ft)
(900,000 GPD) / (157 ft)
Solids Applied lbs/day = 27,022 lbs/day
Flow, MGD X SS, mg/L X 8.34 lbs/gal
0.9 MGD X 3,600 mg/L X 8.34 lbs/gal
Solids Loading, lbs/day/sqft = 14 lbs/day/sqft
(Solids applied, lbs) / (Surface area, sqft)
(27,022 lbs/day) / (1,960 qft)